Analysis of the Calculation of Building Construction for a Laboratory and Lecture Hall at the National Development University "Veteran" in East Java Using Aluminum Formwork Based on Cost and Time

Authors

  • Alifia Pernika Amalia Universitas Sunan Giri Surabaya , Universitas Sunan Giri Surabaya
  • Mohammad Djaelani Universitas Sunan Giri Surabaya
  • Andrian Firdaus Yusuf Universitas Sunan Giri Surabaya

Keywords:

Implementation Cost, Implementation Method, Scheduling, S-Curve

Abstract

Laboratory and Auditorium Development Project of Universitas Pembangunan Nasional “Veteran” Jawa Timur which is located at Jl. Raya Rungkut Madya Gunung Anyar, Surabaya, Jawa Timur. This building has 9 floors and a steel frame roof. The lower structure uses piles and the upper structure uses reinforced concrete. In the preparation of this Applied Final Project, it discusses the comparison between the calculation of time and implementation costs in the Laboratory and Auditorium Building Construction Project at Universitas Pembangunan Nasional “Veteran” Jawa Timur using the existing conventional formwork method (wood) with the Aluminum Formwork method. From this calculation, it is found which method is the most effective to use in terms of time and cost. Time is calculated based on the implementation method used and analysis of production capacity, productivity, and calculation of work duration. The cost is calculated based on analysis in the field through surveys either directly or through equipment and obtained from several pieces of kinds of literature. So that using the right method can be produced time and cost effective. For scheduling each work item, it is done by making bar charts and S curves using the Microsoft Project software application. It is hoped that these calculations can be used as input to the Microsoft Project software application to assist in obtaining the duration and cost of each work item and the selected implementation method.

Published

2023-10-26