An Analysis of Productivity, Cost, and Time Management in the Utilization of Tower Cranes for Construction Projects
Kata Kunci:
construction, productivity, project, tower crane, cost analysis, time managementAbstrak
This research endeavors to provide a comprehensive analysis of the productivity, costs, and time implications associated with the use of tower cranes in construction projects. Drawing inspiration from the prior work of Ir. Putu Darma Wasika, M.M., which primarily focused on labor productivity in construction development, this study employs literature review and field observation methods to gather both primary and secondary data. The objective is to contribute theoretical insights and substantiate research hypotheses, narrowing the focus to the analysis of heavy equipment, specifically tower cranes.
Unduhan
Diterbitkan
2023-10-26
Terbitan
Bagian
Artikel